Total Pageviews

Weather Where We Live

Blog Archive

Wednesday, October 28, 2015

postheadericon Gay Oct-27-15

Today was the day to rebuild the exhaust vent for the new microwave. I wasn’t sure what I needed or how I was going to do it but I knew I needed to go to Lowe’s to see what they had to work with and do some dreaming about it. I dropped Cheri off at Hobby Lobby on the way to Lowe’s. She needed some material to finishes her quilt project. I picked up a few things at Lowe’s that I figured would work for the vent. I picked up Cheri and we headed home. I went to work on the vent and Cheri headed to her sewing room. By 2:30 pm the vent is done and ready to install the upper cabinets. Cheri finished her quilt project, very nice. In order to install the first upper cabinet I needed a piece of lumber that to fur it out away from the end wall ¾ of and inch so there would be room to open the cabinet door. So Cheri and I headed back to Lowe’s to see about the lumber, stain and varnish to match the cabinets. When we got home I cut the lumber and Cheri tried to stain it. The lumber I bought wouldn’t take a stain. So it is back to the drawing board to see what I can come up with.    

Cheri's latest creation.

0 comments: