Total Pageviews

Weather Where We Live

Blog Archive

Friday, September 16, 2016

postheadericon Gay Sept-15-16

I checked the rain gauge and we received just over ¾ inch last night. Cheri worked on her Thursday house work, laundry, and ironing. I worked on getting the drawer slides installed. I made the drawers 1/8 inch too wide and had to do some cutting and sanding on the door face frame to get them to fit properly. I got two of them done before it was time to quit and get cleaned up. Cheri and I met Ron and Sandy at Golden Corral at 1:30 pm for a late lunch and early supper. We were seated in a room where we were the only ones for a while and was able to have a nice visit while eating. It was near 3:00 pm when we got home. Cheri relaxed and I went back to work on the drawer slides. I finally got done around 4:00 pm and was ready for a shower. We watched a couple movies we had recorded weren’t very good but really nothing else on that was worth watching.  

0 comments: