Total Pageviews
Weather Where We Live
Links Of Interest
Blog Archive
-
▼
2014
(365)
-
▼
September
(30)
- Gay Sept-29-14
- Gay Sept-28-14
- Gay Sept-27-14
- Gay Sept-26-14
- Gay Sept-25-14
- Gay Sept-24-14
- Gay Sept-23-14
- Gay Sept-22-14
- Gay Sept-21-14
- Gay Sept-20-14
- Gay Sept-19-14
- Gay Sept-18-14
- Gay Sept-17-14
- Gay Sept-16-14
- Gay Sept-15-14
- Gay Sept-14-14
- Gay Sept-13-14
- Gay Sept-12-14
- Gay Sept-11-14
- Gay Sept-10-14
- Gay Sept-9-14
- Gay Sept-8-14
- Gay Sept-7-14
- Gay Sept-6-14
- Gay Sept-5-14
- Gay Sept-4-14
- Gay Sept-3-14
- Gay Sept-2-14
- Gay Sept-1-14
- Gay Aug-31-14
-
▼
September
(30)
Friday, September 19, 2014
Gay Sept-18-14


Cheri had a very busy day me not so much. Cheri did her pool exercise,
laundry, and put on a coat of paint in the bathroom. I went over to the
neighbor’s and weeded their flowers and trimmed the palm trees. I had ordered
the part for the exercise bike and they don’t want the old one back so I took
it apart to see if maybe I could find out why the display didn’t work. I know
it has to do with no power in the display but after checking what I could it
was a lost cause. I had nothing to lose and a lot to gain if I could have fixed
it. Cheri was just finishing her painting when Mike and Mary came for a visit.
We went out for a late lunch with them and had a wonderful visit as they told
us about their trip to Maine. Later Cheri rested and I did some computer work.
Around 5:00 pm UPS dropped off our new vessel bowel for the bathroom. It is
even prettier than the picture of what we ordered. Cheri was talking to Pam
telling her about it and they decided to come over and see it. Cheri is really
excited about getting it installed and getting the bathroom back to normal. All
the materials that Cheri picked out at Home Depot the other day are a great
match with the vessel bowl.
Subscribe to:
Post Comments (Atom)
0 comments: