Total Pageviews

Weather Where We Live

Blog Archive

Saturday, October 11, 2014

postheadericon Gay Oct-10-14

The back splash needs to dry for another 24 hours before I can do the grouting so I thought it would be a good time to start on the new flooring. It was almost noon before I had the old floor prepared for the new floor. It was a good time to take a break for lunch. Cheri helped me some with the flooring when I needed an extra hand. Otherwise she spent the day in the sewing room. I think she is working on a Christmas tree skirt. The new floor is a vinyl snap and lock, each panel is 1 foot by 2 feet. Almost every panel had to be cut to fit. I had a lot of trouble getting them to snap and lock tight. So I used some of Cheri’s dish soap to lube the joints and everything went together a lot easier. I quit at 5:00 pm, just too tired to do anymore. I am about 90% done. After dinner we watch TV until 9:00 pm and then we did security in the park until 11:00 pm. It was a quiet evening so we quit early. It was a clear evening with the temp in the low 70’s plus we had beautiful full moon. I tried to tell Cheri it was just a lover’s stroll around the park, I don’t think she bought it. 

0 comments: