Total Pageviews
Weather Where We Live
Links Of Interest
Blog Archive
-
▼
2014
(365)
-
▼
October
(31)
- Gay Oct-30-14
- Gay Oct-29-14
- Gay Oct-28-14
- Gay Oct-27-14
- Gay Oct-26-14
- Gay Oct-25-14
- Gay Oct-24-14
- Gay Oct-23-14
- Gay Oct-22-14
- Gay Oct-21-14
- Gay Oct-20-14
- Gay Oct-19-14
- Gay Oct-18-14
- Gay Oct-17-14
- Gay Oct-16-14
- Gay Oct-15-14
- Gay Oct-14-14
- Gay Oct-13-14
- Gay Oct-12-14
- Gay Oct-11-14
- Gay Oct-10-14
- Gay Oct-9-14
- Gay Oct-8-14
- Gay Oct-7-14
- Gay Oct-6-14
- Gay Oct-5-14
- Gay Oct-4-14
- Gay Oct-3-14
- Gay Oct-2-14
- Gay Oct-1-14
- Gay Sept-30-14
-
▼
October
(31)
Saturday, October 11, 2014
Gay Oct-10-14


The back splash needs to
dry for another 24 hours before I can do the grouting so I thought it would be
a good time to start on the new flooring. It was almost noon before I had the
old floor prepared for the new floor. It was a good time to take a break for
lunch. Cheri helped me some with the flooring when I needed an extra hand. Otherwise
she spent the day in the sewing room. I think she is working on a Christmas
tree skirt. The new floor is a vinyl snap and lock, each panel is 1 foot by 2
feet. Almost every panel had to be cut to fit. I had a lot of trouble getting
them to snap and lock tight. So I used some of Cheri’s dish soap to lube the
joints and everything went together a lot easier. I quit at 5:00 pm, just too
tired to do anymore. I am about 90% done. After dinner we watch TV until 9:00
pm and then we did security in the park until 11:00 pm. It was a quiet evening
so we quit early. It was a clear evening with the temp in the low 70’s plus we
had beautiful full moon. I tried to tell Cheri it was just a lover’s stroll around
the park, I don’t think she bought it.
Subscribe to:
Post Comments (Atom)
0 comments: