Total Pageviews
Weather Where We Live
Links Of Interest
Blog Archive
-
▼
2018
(365)
-
▼
February
(28)
- Gay Feb-27-18
- Gay Feb-26-18
- Gay Feb-25-18
- Gay Feb-24-18
- Gay Feb-23-18
- Gay Feb-22-18
- Gay Feb-21-18
- Gay Feb-20-18
- Gay Feb-19-18
- Gay Feb-18-18
- Gay Feb-17-18
- Gay Feb-16-18
- Gay Feb-15-18
- Gay Feb-14-18
- Gay Feb-13-18
- Gay Feb-12-18
- Gay Feb-11-18
- Gay Feb-10-18
- Gay Feb-9-18
- Gay Feb-8-18
- Gay Feb-7-18
- Gay Feb-6-18
- Gay Feb-5-18
- Gay Feb-4-18
- Gay Feb-3-18
- Gay Feb-2-18
- Gay Feb-1-18
- Gay Jan-31-18
-
▼
February
(28)
Friday, February 9, 2018
Gay Feb-8-18


Cheri and Denise spent the
day shopping making a trip to Old Time Pottery and I am sure there were many
more places they shopped. I left the house at 8:30 am and made a quick stop at
Lowe’s as I needed some materials for today’s project. I removed all the
baseboard from the kitchen which turned out to be a big job. Someone had
installed a tile floor over the existing linoleum without removing the
baseboard. I installed some bead board, added door molding around the laundry
door, installed a chair rail over the bead board, and installed new baseboard.
It was 4:30 pm when I got done. I called Cheri and told her I was on my way
home so she could have dinner ready. After dinner I made a trip to Harbor
Freight and then to Lowe’s picking up materials for the project I will be
working on tomorrow. By the time I was done and had my hot shower it was near
8:00 pm. We watched a couple of shows we had recorded and called it a night.
Subscribe to:
Post Comments (Atom)
0 comments: