Total Pageviews
Weather Where We Live
Links Of Interest
Blog Archive
-
▼
2018
(365)
-
▼
November
(30)
- Gay Nov-29-18
- Gay Nov-28-18
- Gay Nov-27-18
- Gay Nov-26-18
- Gay Nov-25-18
- Gay Nov-24-18
- Gay Nov-23-18
- Gay Nov-22-18
- Gay Nov-21-18
- Gay Nov-20-18
- Gay Nov-19-18
- Gay Nov-18-18
- Gay Nov-17-18
- Gay Nov-16-18
- Gay Nov-15-18
- Gay Nov-15-18
- Gay Nov-13-18
- Gay Nov-12-18
- Gay Nov-11-18
- Gay Nov-10-18
- Gay Nov-9-18
- Gay Nov-8-18
- Gay Nov-7-18
- Gay Nov-6-18
- Gay Nov-5-18
- Gay Nov-4-18
- Gay Nov-3-18
- Gay Nov-2-18
- Gay Nov-1-18
- Gay Oct-31-18
-
▼
November
(30)
Friday, November 9, 2018
Gay Nov-8-18


This was supposed to be
our last day working on the bathroom project but with some minor hiccups we
didn’t finish. The grouting took much longer than I thought it would. Larry did
more of the final things along with mixing the grout for me. I had trouble with
the grout setting up before I could use all of it, never had that problem
before. Cheri was there to help after she got the laundry started. She helped
clean the tile after the grouting was done. The main reason we didn’t get done
was a problem with the black grout and caulking. I made a trip to Calver’s for
supper and brought it back to the bathroom project while Cheri was doing some
of the touch up painting. We finally quit at 8:00 pm and then made a trip to
Lowe’s for some black paint to match the black tile. By the time we got
showered and cleaned up we decided it was too late for an evening of TV so
crawled into bed and watch some TV there. Thank you God for guiding us through
another day.
Subscribe to:
Post Comments (Atom)
0 comments: