Total Pageviews

Weather Where We Live

Blog Archive

Friday, November 9, 2018

postheadericon Gay Nov-8-18


This was supposed to be our last day working on the bathroom project but with some minor hiccups we didn’t finish. The grouting took much longer than I thought it would. Larry did more of the final things along with mixing the grout for me. I had trouble with the grout setting up before I could use all of it, never had that problem before. Cheri was there to help after she got the laundry started. She helped clean the tile after the grouting was done. The main reason we didn’t get done was a problem with the black grout and caulking. I made a trip to Calver’s for supper and brought it back to the bathroom project while Cheri was doing some of the touch up painting. We finally quit at 8:00 pm and then made a trip to Lowe’s for some black paint to match the black tile. By the time we got showered and cleaned up we decided it was too late for an evening of TV so crawled into bed and watch some TV there. Thank you God for guiding us through another day.   

0 comments: