Total Pageviews
Weather Where We Live
Links Of Interest
Blog Archive
-
▼
2021
(364)
-
▼
April
(30)
- Gay April-29-21
- Gay April-28-21
- Gay April-27-21
- Gay April-26-21
- Gay April-25-21
- Gay April-24-21
- Gay April-23-21
- Gay April-22-21
- Gay April-21-21
- Gay April-20-21
- Gay April-19-21
- Gay April-18-21
- Gay April-17-21
- Gay April-16-21
- Gay April-15-21
- Gay April-14-21
- Gay April-13-21
- Gay April-12-21
- Gay April-11-21
- Gay April-10-21
- Gay April-9-21
- Gay April-8-21
- Gay April-7-21
- Gay April-6-21
- Gay April-5-21
- Gay April-4-21
- Gay April-3-21
- Gay April-2-21
- Gay April-1-21
- Gay Mar-31-21
-
▼
April
(30)
Gay April-2-21


It was 20 degrees colder
this morning for the walk and a high of 71 degrees plus a good breeze. I left
the house at 8:45 am heading back to Tampa Bay country to finish the bathroom
project. I got the counter top, backsplash, light, mirror, water lines, and drain all
installed and hooked up. I also got the caulking done. I removed the bathroom
fan and cleaned it from all the dust when I was sanding the wall. I also
removed the drapery brackets so the painting can be done and wants them up
higher on the wall which I will have to go back for along with installing the
vanity doors she is painting. I put a thin coat of plaster on a half wall that
was rough from plaster texture. I was home by 4:00 pm and then cleaned out the
truck getting it ready for tomorrow. Cheri was busy with laundry and grocery
shopping. I went to Culver’s for a three piece fish dinner that Cheri and split
and still had enough to eat. I was tired and couldn’t stay awake to watch any
TV. So at 8:00 pm I gave up and went to bed. Thank you God for a blessed a
blessed day.
![]() |
The bathroom project done |
![]() |
New toilet. |
0 comments: