Total Pageviews

Weather Where We Live

Blog Archive

Saturday, May 24, 2014

postheadericon Gay May-23-14

It was a busy day for the Sharps. After all the exercising was done it was time to face the rest of a very hot day with temps in the low to mid 90’s and high humidity. Cheri got our laundry done early and headed for the sewing room. This forenoon she finished one panel of the six panels Christmas wall hanging. I went over to the neighbor’s and got the new fill valve installed in her toilet, front door fixed, and the outside faucet leak repaired. It was near noon before I got done and the tools put away. After lunch Cheri and I went to a different place to look at window awnings for the front of the house. We found just what we were looking for and ordered them, should have them in the next week or two. From there we went to a plant  nursery on the north west side of town that I found on the internet which I had rode the motorcycle by a few time and had forgot it was there. We got to talk to the owners and they were a great help in picking out what we wanted. We have decided to wait until we get the new awnings up as the plants would be in the way to install the awnings. Then Cheri wanted to go to Jo-Ann’s to get some fabric for the next panel of her Christmas hanging. We also stopped at Sam’s to look at plant pots that we were told about at the nursery. Cheri thought that they were too big and we have another place we want to check out in Brandon. Late this afternoon I got a call from one of the cement contractors and he came around 6:30 pm to give us an estimate. Long story short we ended up signing a contract and were told that he is going to start tomorrow, so we will see if he is a man of his word.


0 comments: