Total Pageviews

Weather Where We Live

Blog Archive

Friday, November 13, 2015

postheadericon Gay Nov-12-15

Cheri worked on painting the lower part of the walls before we put up the chair rail which will divide the two paint colors. Darren and I worked on putting down the floor in the garage attic and even got a lot of things put up that were stored in the garage. Then it was time to work with chair rail. After making a couple of sample cuts I realized we needed a square to make sure we had the saw set up right. So we headed to Lowe’s to get the square and a level. While we were there Darren also bought a couple of cabinets for the garage. We also checked out flooring for the bathroom in the loft. When we got home we had lunch and then back to work. We got several pieces of chair rail up but not without me making some miss measurements and wrong cuts. But the more we did the better I got. What we have done looks nice but we still have a lot left to do. We quit at 6:00 pm and headed downtown to have Mexican for supper which was very good. We got so much food we brought home enough for another meal. After supper we went to the grocery store to get a few things Cheri needs to make cookies, a bagel dip that Brooke likes, and Lasagna for tomorrow.  

Some of the chair rail is up
     

0 comments: