Total Pageviews

Weather Where We Live

Blog Archive

Thursday, May 2, 2019

postheadericon Gay May-1-19


I was back to work on the flooring project at 9:00 am. By noon all the flooring was down. Still needed to do all the transition strips but first time to go home for lunch. When I got home Cheri was out washing the love bugs off the car. Yep it is love bug season again which last around two to three weeks. I never knew what love bugs where until I moved to Florida. If you don’t get them off the car right away they can stain the paint. After lunch I headed back to the floor project and got the transition strips installed. Another happy customer. It was 3:00 pm when I got home and unloaded the truck with the tools I done need for tomorrow’s project. Then I went next door to remove a flat tire from Jean’s car and took it to Wal-Mart to be repaired which will be ready to pick up tomorrow. From Wal-Mart I took the car through the carwash. Cheri spent most of her day in the sewing room. We had left over roast beef in gravy over toast for supper. Spent the evening in front of the TV. Most of our shows are done for the season, time to do some channel surfing to find something to watch. Thank you God for a blessed day and all the guidance you provided for us.   
The flooring is done




0 comments: