Total Pageviews
Weather Where We Live
Links Of Interest
Blog Archive
-
▼
2019
(361)
-
▼
May
(31)
- Gay May-30-19
- Gay May-29-19
- Gay May-28-19
- Gay May-27-19
- Gay May-26-19
- Gay May-25-19
- Gay May-24-19
- Gay May-23-19
- Gay May-22-19
- Gay May-21-19
- Gay May-20-19
- Gay May-19-19
- Gay May-18-19
- Gay May-17-19
- Gay may-16-19
- Gay May-15-19
- Gay May-14-19
- Gay May-14-19
- Gay May-12-19
- Gay May-11-19
- Gay May-10-19
- Gay May-9-19
- Gay May-8-19
- Gay May-7-19
- Gay May-6-19
- Gay May-5-19
- Gay May-4-19
- Gay May-3-19
- Gay May-2-19
- Gay May-1-19
- Gay April-30-19
-
▼
May
(31)
Wednesday, May 29, 2019
Gay May-28-19


I started work a little
after 8:00 am so I could get new shower drain installed before it got too hot
outside. I did have a good day and got all the plumbing done although I did
have a water leak when I did the water test. Just one fitting that needed to be
tightened. I also got two pieces of the backer board installed. It was 4:30
when I got home to pick up a shower grab bar and install it for another client
here in the park. When all was said and done I was home around 5:30 pm. Time
for good long hot shower while Cheri was fixing baked pork chops along with the
leftover potato salad for supper. After Cheri got her Tuesday house work done
she went over to visit with Jean. She spent the rest of the day in her sewing
room. We settled in for an evening of TV more for Cheri as I napped until it
was time to go to bed. Thank you God for a blessed day.
![]() |
Things are starting to come together |
![]() |
shower base is installed along with some backer board |