Total Pageviews

Weather Where We Live

Blog Archive

Wednesday, May 29, 2019

postheadericon Gay May-28-19


I started work a little after 8:00 am so I could get new shower drain installed before it got too hot outside. I did have a good day and got all the plumbing done although I did have a water leak when I did the water test. Just one fitting that needed to be tightened. I also got two pieces of the backer board installed. It was 4:30 when I got home to pick up a shower grab bar and install it for another client here in the park. When all was said and done I was home around 5:30 pm. Time for good long hot shower while Cheri was fixing baked pork chops along with the leftover potato salad for supper. After Cheri got her Tuesday house work done she went over to visit with Jean. She spent the rest of the day in her sewing room. We settled in for an evening of TV more for Cheri as I napped until it was time to go to bed. Thank you God for a blessed day.

Things are starting to come together

shower base is installed along with some backer board


0 comments: