Total Pageviews
Weather Where We Live
Links Of Interest
Blog Archive
-
▼
2019
(361)
-
▼
May
(31)
- Gay May-30-19
- Gay May-29-19
- Gay May-28-19
- Gay May-27-19
- Gay May-26-19
- Gay May-25-19
- Gay May-24-19
- Gay May-23-19
- Gay May-22-19
- Gay May-21-19
- Gay May-20-19
- Gay May-19-19
- Gay May-18-19
- Gay May-17-19
- Gay may-16-19
- Gay May-15-19
- Gay May-14-19
- Gay May-14-19
- Gay May-12-19
- Gay May-11-19
- Gay May-10-19
- Gay May-9-19
- Gay May-8-19
- Gay May-7-19
- Gay May-6-19
- Gay May-5-19
- Gay May-4-19
- Gay May-3-19
- Gay May-2-19
- Gay May-1-19
- Gay April-30-19
-
▼
May
(31)
Friday, May 17, 2019
Gay may-16-19


We had a good day working
on the Sunday school kitchen. Cheri, Frank, and Jerry finished the painting
which was good because it had to be done before I could start laying the new
flooring. I left the house early so I could stop at Lowe’s to get some
materials so I could finish the new door framing. Part of the kitchen had a suspended
ceiling and the tile were broken so Cheri and I removed them and will have to
get some new tiles. Also found a very bad electrical wiring problem that will
have to be fixed. I did get a good start on the flooring before it was time to
quit for the day. I also got a call from a guy here in our park that was having
a problem with wiring in his truck. He had installed front sensors and couldn’t
figure out on to wire in a switch for them. So I stopped on my way home and
showed him how it had to be wired. I also stopped a Lowe’s to get the new
ceiling tiles. It was 5:30 pm when I got home. Cheri was ready start supper
while I took my shower. We had ribeye steak along with a baked potato. We
watched the season finale of Survivor and was surprised of the ending. Thank
you God for guiding us through this day.
![]() |
Underlayment is done and ready for flooring |
![]() |
Got a start on the flooring |
Subscribe to:
Post Comments (Atom)
0 comments: