Total Pageviews
Weather Where We Live
Links Of Interest
Blog Archive
-
▼
2017
(359)
-
▼
January
(31)
- Gay Jan-30-17
- Gay Jan-29-17
- Gay Jan-28-17
- Gay Jan-27-17
- Gay Jan-26-17
- Gay Jan-25-17
- Gay Jan-24-17
- Gay Jan-23-17
- Gay Jan-22-17
- Gay Jan-21-17
- Gay Jan-20-17
- Gay Jan-19-17
- Gay Jan-18-17
- Gay Jan-17-17
- Gay Jan-16-17
- Gay Jan-15-16
- Gay Jan-14-17
- Gay Jan-13-17
- Gay Jan-12-17
- Gay Jan-11-17
- Gay Jan-10-17
- Gay Jan-9-17
- Gay Jan-8-17
- Gay Jan-7-17
- Gay Jan-6-17
- Gay Jan-5-17
- Gay Jan-4-17
- Gay Jan-3-17
- Gay Jan-2-17
- Gay Jan-1-17
- Gay Dec-31-16
-
▼
January
(31)
Tuesday, January 24, 2017
Gay Jan-23-17


First I want to wish our grand daughter Cece a happy birthday. Cheri was up about half an
hour before me and I got up at 5:30 am. After a much need coffee and a bagel it
was time to get started on the loft flooring. Cheri got to keep Wyatt here
today as she was free from work assignment. The first thing I did was put on a
coat of plaster around two of the can lights from a mistake I made, one from
the last time we were here and the one I put in last week. It took a while to
get the sub floor ready for flooring. Then it took me awhile to get the cuts
around the stairs and office door. Once that was done thing went well. I got as
far as I could go because of having to move stuff to the other side of the
room. Once I got everything moved it was 4:15 pm. It was time to take a shower
and get ready to go over to Chris and Cheryl’s as they had invited us over for
dinner. Brooke got home around 4:30 pm and Darren a short time later. Chris and
Cheryl fixed a wonderful meal of beef roast with all the fixings along with biscuits,
gravy, and beans. We had a wonderful visit getting caught up on what has been
going on since the last time we were together. We were back home a little past
7:00 pm and watched a little TV before calling it a night.
Time to start loft flooring |
This is what I have left to do in the loft |
Subscribe to:
Post Comments (Atom)
0 comments: