Thursday, January 26, 2017

postheadericon Gay Jan-25-17

Cheri was able to take care of Wyatt today as she only had some minor painting to do which she could do while Wyatt napped. I had trouble getting myself motivated today, so it was near 8:00 am before I got started working. I started with the ceiling around the lights which I thought I was done with but needed another thin coat of plaster before Cheri could paint. I needed some glue for the bathroom floor so I made a trip to Home Depot to get that along with an in floor electrical outlet. When I got back I went right to work on the flooring. With the flooring done I needed some additional base board and shoe base molding. So it was back to Home Depot one more time. While I was gone Cheri got the ceiling painted. When I got back I watched Wyatt while Cheri painted the moldings I just got. I had a few other things to do while the paint dried. Then it was time to finish the trim work. It was 7:00 pm when I finally got done. All that is left is the room with the bathtub and toilet is and a piece of molding in the loaf which Darren has to order, something for another time. Darren order in pizza for supper. After supper I took a nice hot shower and was ready for bed. I checked and had laid 383 square feet of flooring.     

Vanity area

Closet 

Loft

Other end of loft, still have a lot of clean up to do

0 comments: