Total Pageviews
Weather Where We Live
Links Of Interest
Blog Archive
-
▼
2019
(361)
-
▼
July
(31)
- Gay July-30-19
- Gay July-29-19
- Gay July-28-19
- Gay July-27-19
- Gay July-26-19
- Gay July-25-19
- Gay July-24-19
- Gay July-23-19
- Gay July-22-19
- Gay July-21-19
- Gay July-20-19
- Gay July-19-19
- Gay July-18-19
- Gay July-17-19
- Gay July-16-19
- Gay July-15-19
- Gay July-14-19
- Gay July-13-19
- Gay July-12-19
- Gay July-11-19
- Gay July-10-19
- Gay July-9-19
- Gay July-8-19
- Gay July-7-19
- Gay July-6-19
- Gay July-5-19
- Gay July-4-19
- Gay July-3-19
- Gay July-2-19
- Gay July-1-19
- Gay June-30-19
-
▼
July
(31)
Friday, July 26, 2019
Gay July-25-19


We had rain most all day and received over two inches for
the last two days. I headed back to the floor project in Tampa Bay country. I
got the baseboard installed, transition strips installed, the caulking done,
closet doors reinstalled, put the bed frame together, moved furniture back in
the bedroom, took down a cornice in the dining room, installed a window screen,
and repaired a leak in the washing machine. So this project is done and was
home by 3:00 pm. I had to move the car from the carport so I could get the truck
under cover to keep my tools from getting wet. I only unloaded enough so I
could get the cover down and locked. After my shower I headed out to check out
a window leaking problem. I found two windows that wasn’t install correctly and
need to be removed, the casings rebuilt from the water damage. I decided it was
a job that I didn’t want to do as it could turn out to be a bigger problem than
what I could see. Cheri was busy with laundry and spending time in her sewing
room. Cheri fixed us a new chicken recipe in the new Instant Pot. It was very
good. It was normal evening watching the new summer shows we had recorded.
Thank you God for blessed day.
![]() |
Project done |
Subscribe to:
Post Comments (Atom)
0 comments: