Total Pageviews

Weather Where We Live

Blog Archive

Friday, July 26, 2019

postheadericon Gay July-25-19


We had rain most all day and received over two inches for the last two days. I headed back to the floor project in Tampa Bay country. I got the baseboard installed, transition strips installed, the caulking done, closet doors reinstalled, put the bed frame together, moved furniture back in the bedroom, took down a cornice in the dining room, installed a window screen, and repaired a leak in the washing machine. So this project is done and was home by 3:00 pm. I had to move the car from the carport so I could get the truck under cover to keep my tools from getting wet. I only unloaded enough so I could get the cover down and locked. After my shower I headed out to check out a window leaking problem. I found two windows that wasn’t install correctly and need to be removed, the casings rebuilt from the water damage. I decided it was a job that I didn’t want to do as it could turn out to be a bigger problem than what I could see. Cheri was busy with laundry and spending time in her sewing room. Cheri fixed us a new chicken recipe in the new Instant Pot. It was very good. It was normal evening watching the new summer shows we had recorded. Thank you God for blessed day.




Project done



0 comments: