Total Pageviews
Weather Where We Live
Links Of Interest
Blog Archive
-
▼
2019
(361)
-
▼
November
(30)
- Gay Nov-29-19
- Gay Nov-28-19
- Gay Nov-27-19
- Gay Nov-26-19
- Gay Nov-25-19
- Gay Nov-24-19
- Gay Nov-23-19
- Gay Nov-22-19
- Gay Nov-21-19
- Gay Nov-20-19
- Gay Nov-19-19
- Gay Nov-18-19
- Gay Nov-17-19
- Gay Nov-16-19
- Gay Nov-15-19
- Gay Nov-14-19
- Gay Nov-13-19
- Gay Nov-12-19
- Gay Nov-11-19
- Gay Nov-10-19
- Gay Nov-9-19
- Gay Nov-8-19
- Gay Nov-7-19
- Gay Nov-6-19
- Gay Nov-5-19
- Gay Nov-4-19
- Gay Nov-3-19
- Gay Nov-2-19
- Gay Nov-1-19
- Gay Oct-31-19
-
▼
November
(30)
Thursday, November 21, 2019
Gay Nov-20-19


It was a cold 40 degrees
this morning but turned to be a nice sunny day with no wind. I was back at work
over in Tampa Bay country. My project for the day was to run a water line to the
lanai where they have a swimming pool. Well when I got there they had me remove
two towel bars that were plastered into the wall. So they wanted the wall
patched so it could be painted as the painter was there painting the bathroom
and kitchen. They failed to realize it takes a couple of days for patching and
a couple coats of plaster. When I started on the water line I realized I had
bought the wrong pipe. So I headed back to Zephyrhills Lowe’s for the right
pipe and as long as I was close to home I stopped for lunch and some drywall
for patching towel bar holes. I was back on the job by 1:00 pm. I got the wall
patched and one coat of plaster on. Then it was back to work on the water line
which I got done. It was a long day and didn’t get home until 6:15 pm. Cheri
was busy with her Wednesday house work and working in her sewing room. She fixed
us leftover brats and potato salad for supper. We are still trying to get
caught up on our TV shows as we are still behind by three episodes. Thank you
God for a bless day.
Subscribe to:
Post Comments (Atom)
0 comments: