Total Pageviews
Weather Where We Live
Links Of Interest
Blog Archive
-
▼
2019
(361)
-
▼
November
(30)
- Gay Nov-29-19
- Gay Nov-28-19
- Gay Nov-27-19
- Gay Nov-26-19
- Gay Nov-25-19
- Gay Nov-24-19
- Gay Nov-23-19
- Gay Nov-22-19
- Gay Nov-21-19
- Gay Nov-20-19
- Gay Nov-19-19
- Gay Nov-18-19
- Gay Nov-17-19
- Gay Nov-16-19
- Gay Nov-15-19
- Gay Nov-14-19
- Gay Nov-13-19
- Gay Nov-12-19
- Gay Nov-11-19
- Gay Nov-10-19
- Gay Nov-9-19
- Gay Nov-8-19
- Gay Nov-7-19
- Gay Nov-6-19
- Gay Nov-5-19
- Gay Nov-4-19
- Gay Nov-3-19
- Gay Nov-2-19
- Gay Nov-1-19
- Gay Oct-31-19
-
▼
November
(30)
Tuesday, November 5, 2019
Gay Nov-4-19


I was up at 4:00 am all
stuffed up and not able to breath. I did go to work this morning and probably
shouldn’t as I was in a heavy sweat all day. I tied to install the new vanity
today but there is still some painting and wall repair that the painter is
doing. I did get the transition strips glued down in the master bedroom closets.
Then I worked on the electrical project in the garage to install an electrical
outlet for the refrigerator. It was 4:00 pm when I got done and headed home. I
did make a stop in our park to check out a project of replacing the floor in
the kitchen sink cabinet. Cheri went over to Baker Acers to get Grandma’s house
up for sale. Plus she got groceries at Wal-Mart. This afternoon she worked on a
couple of tubs of things we brought over from Grandma’s. Cheri fixed us a
couple of TV diners which was ok but Cheri didn’t like them. It was a normal
evening of TV with a bowl of ice cream. Thank you God for a blessed day.
Subscribe to:
Post Comments (Atom)
0 comments: