Total Pageviews

Weather Where We Live

Blog Archive

Wednesday, September 2, 2015

postheadericon Gay Sept-1-15

It was a busy day in the Sharp house as we had a lot going on. I took Cheri for her 9:00 am dentist appointment and were back home by 10:00 am. OK it is time for Cheri and me to get the new hot water heater out of the back seat of the car. It took a little work but got out and into the sunroom. Cheri headed for her sewing room and I started removing the old water heater (just thinking why they call it a hot water heater? If the water is already hot there is no reason to heat it.) The first thing was to get the old one drained, which took a long time and gave me a chance to do my Bible study. Getting the old one out was quite the job. I got a tarp and put it down on the floor and worked the heater onto it then with Cheri pushing and me pulling we got it out the back door. Then it was time to get the floor where the old heater was setting cleaned up and ready for the new drain pan. I had to make a quick trip to Lowe’s to get a couple of pieces of PVC pipe for the drain pan. By 3:30 pm we had the new water heater in place and ready to hook up. But that had to wait as I needed to take Cheri for her appointment at 4:00 pm. I had told Cheri I would take her out for supper after her appointment. But it didn’t get over until 5:30 pm and we were both tired and decided to come home and have some soup for supper. Also I wanted to get back to work on the water heater. By 7:00 pm I had everything hooked up and by 7:10 pm we had hot water. I still have all the clean up to do which will take me about an hour or a little more and that can wait until tomorrow, too tired to do any more today.

0 comments: