Total Pageviews
Weather Where We Live
Links Of Interest
Blog Archive
-
▼
2016
(366)
-
▼
November
(30)
- Gay Nov-29-16
- Gay Nov-28-16
- Gay Nov-27-16
- Gay Nov-26-16
- Gay Nov-25-16
- Gay Nov-24-16
- Gay Nov-23-16
- Gay Nov-22-16
- Gay Nov-21-16
- Gay Nov-20-16
- Gay Nov-19-16
- Gay Nov-18-16
- Gay Nov-17-16
- Gay Nov-16-16
- Gay Nov-15-16
- Gay Nov-14-16
- Gay Nov-13-16
- Gay Nov-12-16
- Gay Nov-11-16
- Gay Nov-10-16
- Gay Nov-9-16
- Gay Nov-8-16
- Gay Nov-7-16
- Gay Nov-6-16
- Gay Nov-5-16
- Gay Nov-4-16
- Gay Nov-3-16
- Gay Nov-2-16
- Gay Nov-1-16
- Gay Oct-31-16
-
▼
November
(30)
Monday, November 21, 2016
Gay Nov-21-16


It was 36 degrees here in Roswell GA, time to
head back to Florida. Today was supposed to be an easy day putting four can
lights and removing the two lights that were in the loft. But things went
really wrong right after I started. I took the first existing light down and
removed the existing electrical box. Now all I have to do is make the hole
larger for the can light. But checking there was a gas pipe right about the electrical
box with no room for the can light. So I move the spot for the new can light it
came right next to the air and heating duct. So of course I had to do the same
with the other existing light so they would be in a row. I did get all new
holes made for the new cans. Next came the problem of fishing the new electrical
wire. It took a while before I was ready to put the cans in. I finally got the
lights in and working. Next I had to close up the existing holes. Had to make a
trip to Home Depot to get the materials to plaster the existing holes. I got
one coat plaster on and hope to get another one in the morning before we leave
for Florida. I guess the last coat of plaster and sanding will have to wait
until we get back up here to see baby Wyatt.
Subscribe to:
Post Comments (Atom)
0 comments: