Total Pageviews

Weather Where We Live

Blog Archive

Tuesday, August 28, 2018

postheadericon Gay Aug-27-18


I had a really good day at work in Tampa Bay country. The project I started on today was to remove a one inch wide tile strip from a bathroom tub shower and replace it with a different color of tile. I had done this to the master bath shower before and was a really hard job getting the old tile out. But today things went really smoothly as the old tile came out easily. I got the new tile in and is now ready to grout. Next I remove all the baseboard and molding from the bathroom floor getting it ready to put down new tile. I also got a call that a party in our park that had a broken sink drain and wanted to know if I could fix it. I told them it would be late this afternoon. I arrived at 5:00 pm to check it out. The wife had dropped an earring in the sink and went down the drain and the husband took it apart to get the earring and broke the drain. I had to go to Lowe’s for the parts. Long story short I was done and home by 6:30 pm. I was really dirty from all the tile dust so I headed for the shower. Cheri spent the day in her sewing room working on a new quilt project. She also made a ham casserole for supper. By the time we were done eating and ready for an evening of TV it was already 7:30 pm. No rain here today but this evening I could see it was dark in the east with lighting. Thank you God for a great day.   

0 comments: