Total Pageviews

Weather Where We Live

Blog Archive

Thursday, August 9, 2018

postheadericon Gay Aug-8-18


We are still having really hot weather in the mid to upper 90’s with high heat index. So glad I am working inside this week, only out to make tile cuts. So today it was back to installing kitchen backsplash tiles. I started at 8:30 am and quit at 12:15 pm to have lunch and get ready for a meeting at church with Pastor Randy and Jim Wilson. Jim and I have volunteered to do some repair work at church. Pastor Randy is going to put together a list of things that need to be done. It was a short meeting and was back to the tile project by 2:15 pm. I finished the tile install at 4:30 pm. Cheri had supper waiting for me as I was supposed to go out to Ron and Sandy’s to repair a broken water pipe in the attic. Ron called me around 3:30 pm and said that he had Jay (another friend) coming to do the repair. I was happy to hear that because I was really tired and ready for a good hot shower. Cheri spent most of the day working in her sewing room on the prayer quilt she is making. Barbra had Cheri over as she had some more paint samples and is now thinking about painting the kitchen cabinets gray and wanted Cheri’s input. It was a short evening for me trying to watch TV. I decided to go to bed early instead of napping in the recliner. Thank you God for a productive day.

0 comments: