Total Pageviews

Weather Where We Live

Blog Archive

Thursday, September 13, 2018

postheadericon Gay Sept-12-18


I had a good day which started at 8:15 am. My first stop was at Judy’s where Cheri and I built the gazebo. She had the rain problem where the water off the house roof was coming done inside the gazebo. There is only an inch of room from the roof overhang to the edge of the gazebo. So I made a gutter that is one inch wide and four inches deep and seven feet long to divert the water. My next stop was Bob and Donna’s at 10:00 am to start the bathroom remodel. This was demo day. I got a lot done but still have more demo to do. I was home a little after 4:00 pm. Cheri didn’t have a very good day as she had a very bad headache. She still made potato salad and ham for supper along with fresh baked dinner rolls. She also made an apple pie for dessert. After supper we made a trip to Lowe’s to get some plumbing supplies as I need to cap off some water lines from the bathtub, shower, and toilet as everything will be moved to a different location. On the way home we stopped at Wawa to have a couple of mint chocolate chip Flurricanes which are like DQ’s Blizzards but much cheaper. This evening Cheri read and watched TV. I went to bed early as I was really tired. Thank you God for a productive day.
Before Demo

Before Demo

Before Demo

Before Demo

After day one demo

After day one demo

After day one demo


0 comments: