Total Pageviews
Weather Where We Live
Links Of Interest
Blog Archive
-
▼
2018
(365)
-
▼
September
(30)
- Gay Sept-29-18
- Gay Sept-28-18
- Gay Sept-27-18
- Gay Sept-26-18
- Gay Sept-25-18
- Gay Sept-24-18
- Gay Sept-23-18
- Gay Sept-22-18
- Gay Sept-21-18
- Gay Sept-20-18
- Gay Sept-19-18
- Gay Sept-18-18
- Gay Sept-17-18
- Gay Sept-16-18
- Gay Sept-15-18
- Gay Sept-14-18
- Gay Sept-13-18
- Gay Sept-12-18
- Gay Sept-11-18
- Gay Sept-10-18
- Gay Sept-9-18
- Gay Sept-8-18
- Gay Sept-7-18
- Gay Sept-6-18
- Gay Sept-5-18
- Gay Sept-4-18
- Gay Sept-3-18
- Gay Sept-2-18
- Gay Sept-1-18
- Gay Aug-31-18
-
▼
September
(30)
Friday, September 28, 2018
Gay Sept-27-18


I didn’t get as much done
today as I thought I would. I am still working on the bathroom project and will
be for some time. I was working on getting the water installed to the shower
which should have taking a couple of hours. I had to make a trip to Lowe’s this
morning to get supply lines for the shower faucet. While hooking up the water I
realized two of the supply lines were too short so it was back to Lowe’s for
two longer lines. Things went well until I turned on the water as the front of
the faucet came apart and had water all over. When I had bought the faucet set
the box had been opened and there were only two sets and both had been opened.
After checking them out it looked like everything was there. Well it turned out
that the retaining ring was missing which holds the faucet cartridge in place.
So back to Lowe’s and they now had a couple of new boxes that hadn’t been
opened and bought one of them for the parts. After a few more minor problems I
got the water hooked up. After all of this it was 2:30 pm. I decided to go and
see about the glass for the shower wall. Not real happy about what I found out.
They won’t come out and measure until the tile is installed which I can
understand but after they do measure it will be three to four weeks for the
install. Which all of this means I won’t be able to have the project done
before Bob and Donna return for the winter. Cheri was busy with laundry and
Thursday house work. I think she also spent some time in her sewing room. This evening
we met Mike and Pam at Culver’s for supper and then went with them to look at another
house. It is a very nice home and I think the best one so far that we have
looked at. I couldn’t see where any work had to be done. They plan on putting
in an offer on it. It was 7:30 pm when we got home to settle in and watch some
TV before calling it a night. It started raining around 9:00 pm and continued with
a light rain all night. Thank you God for a blessed day.
Subscribe to:
Post Comments (Atom)
0 comments: