Total Pageviews
Weather Where We Live
Links Of Interest
Blog Archive
-
▼
2018
(365)
-
▼
September
(30)
- Gay Sept-29-18
- Gay Sept-28-18
- Gay Sept-27-18
- Gay Sept-26-18
- Gay Sept-25-18
- Gay Sept-24-18
- Gay Sept-23-18
- Gay Sept-22-18
- Gay Sept-21-18
- Gay Sept-20-18
- Gay Sept-19-18
- Gay Sept-18-18
- Gay Sept-17-18
- Gay Sept-16-18
- Gay Sept-15-18
- Gay Sept-14-18
- Gay Sept-13-18
- Gay Sept-12-18
- Gay Sept-11-18
- Gay Sept-10-18
- Gay Sept-9-18
- Gay Sept-8-18
- Gay Sept-7-18
- Gay Sept-6-18
- Gay Sept-5-18
- Gay Sept-4-18
- Gay Sept-3-18
- Gay Sept-2-18
- Gay Sept-1-18
- Gay Aug-31-18
-
▼
September
(30)
Thursday, September 27, 2018
Gay Sept-26-18


I was back to work on the
bathroom project. I am happy with the design change that I made to the entrance
of the shower which makes it look much better.
I continued with wall framing. The good news is 90 percent of it is
done. Later this afternoon I made a trip to Lowe’s to get the shower faucet,
toilet shutoff, and some additional plumbing fitting for the shower water
supply. Cheri was out shopping today and stopped by on her way home to see how
I was doing. It was near 4:30 pm when I got home and was pleased on what I got
done today. After my shower and supper Cheri and I settled in to watch some
more of the new fall shows. We watched New Amsterdam which was full of action
and we liked it. We also watch FBI and looks like it might make the grade. Then
it was time to watch Survivor which we like. Although I went to sleep during
the show and will have catch up on it tomorrow. We have had a few days without rain which is really nice, still very hot in the low 90's. Thank you God for a very
productive day.
Subscribe to:
Post Comments (Atom)
0 comments: