Total Pageviews
Weather Where We Live
Links Of Interest
Blog Archive
-
▼
2018
(365)
-
▼
September
(30)
- Gay Sept-29-18
- Gay Sept-28-18
- Gay Sept-27-18
- Gay Sept-26-18
- Gay Sept-25-18
- Gay Sept-24-18
- Gay Sept-23-18
- Gay Sept-22-18
- Gay Sept-21-18
- Gay Sept-20-18
- Gay Sept-19-18
- Gay Sept-18-18
- Gay Sept-17-18
- Gay Sept-16-18
- Gay Sept-15-18
- Gay Sept-14-18
- Gay Sept-13-18
- Gay Sept-12-18
- Gay Sept-11-18
- Gay Sept-10-18
- Gay Sept-9-18
- Gay Sept-8-18
- Gay Sept-7-18
- Gay Sept-6-18
- Gay Sept-5-18
- Gay Sept-4-18
- Gay Sept-3-18
- Gay Sept-2-18
- Gay Sept-1-18
- Gay Aug-31-18
-
▼
September
(30)
Tuesday, September 18, 2018
Gay Sept-17-18


I was back to work on the
bathroom project today. The plan was to get all the plumbing roughed in. I got
the floors opened up and did a survey on what I needed for the project and
headed to Lowe’s for the materials. When I started laying the toilet drain I
run into another problem as when I moved some of the insulation there was the
steel frame of the house which was going to be a problem. I headed back to Lowe’s
to get some additional fittings. After some additional work I got the toilet
plumbing done. Next was to work on the shower drain rough-in. I had to open up
more of the outside wall so I can add more support for the shower end wall
which has to be done before I can proceed with the shower drain as the new
shower vent has to be in the new wall. Long story short I didn’t get as much
done as I wanted today. I had started at 8:00 am and was near 5:00 pm when I
got home. Cheri spent the day with Monday house work and time in the sewing
room. We had brought home some leftover pulled pork from Linger Longer
yesterday so Cheri fixed us the pull pork along with leftover baked beans for
supper. Our evening was spent watching some shows we had recorded. Thank you
God for guiding us through our problems today.