Total Pageviews

Weather Where We Live

Blog Archive

Tuesday, September 18, 2018

postheadericon Gay Sept-17-18


I was back to work on the bathroom project today. The plan was to get all the plumbing roughed in. I got the floors opened up and did a survey on what I needed for the project and headed to Lowe’s for the materials. When I started laying the toilet drain I run into another problem as when I moved some of the insulation there was the steel frame of the house which was going to be a problem. I headed back to Lowe’s to get some additional fittings. After some additional work I got the toilet plumbing done. Next was to work on the shower drain rough-in. I had to open up more of the outside wall so I can add more support for the shower end wall which has to be done before I can proceed with the shower drain as the new shower vent has to be in the new wall. Long story short I didn’t get as much done as I wanted today. I had started at 8:00 am and was near 5:00 pm when I got home. Cheri spent the day with Monday house work and time in the sewing room. We had brought home some leftover pulled pork from Linger Longer yesterday so Cheri fixed us the pull pork along with leftover baked beans for supper. Our evening was spent watching some shows we had recorded. Thank you God for guiding us through our problems today.    

0 comments: