Total Pageviews

Weather Where We Live

Blog Archive

Friday, September 7, 2018

postheadericon Gay Sept-6-18


It was a good day for both Cheri and me. I was back to work at 8:30 am to finish the backsplash tile install. I was done by 2:30 pm, tomorrow I should be able to do the grouting. Then I headed for Rick and Gloria’s to fix their lawn mower that I found a bad spindle bearing last week. Rick was able to get new bearing installed in the existing spindle. After getting it back together I mowed the lawn which should have been done last Saturday. It was 5:45 pm when I got home. I was hot and tired so the shower felt really good. Cheri was busy this forenoon with laundry and her normal Thursday house work. This afternoon she met Lee at the quilt shop in Dade City.  They both came home with some additional material. Cheri spent the rest of the afternoon in her sewing room. She also made a meatloaf for supper along with a baked potato with creamed corn. I had about half an hour to rest before meeting Donna Perkins at her place to go over the plans for her bathroom remodel. She had sample of the tile she wants installed on the floor and in the shower. Between the two of us I think we have a final plan on how she wants it done. It was near 9:00 pm when I got home. I watched a little TV with Cheri before calling it a night. We also got another inch of rain this evening. Thank you God for a blessed day.     

Tile is now ready for grout



0 comments: