Total Pageviews

Weather Where We Live

Blog Archive

Wednesday, October 24, 2018

postheadericon Gay Oct-23-18


I was back to work on the bathroom project at 8:00 am. I was going to grout the bathroom floor right away this morning but decided to cut and place tile in the shower floor. I had trouble getting the tiles to fit together and decided if I did the main part and left the tiles that needed to be cut that they would fit together better. But when I put glued the first tile down it didn’t want to stick to the concrete. So I gave the concrete a good washing and went to Lowe’s to get a concrete sealer that should take care of the problem. After all of that I settled in and did the grouting on the bathroom floor. Tomorrow it will be ready for a good cleaning and it will be done. I also worked on sanding down the toilet riser I have made to raise the toilet 4 ½ inches. It was 5:30 pm when I finally got done for the day. After Cheri got her Tuesday house work done she went over to Mike and Pam’s to help Pam pack up dishes for the move to their new house this weekend. It was around 5:00 pm when she got home. We had leftover soup and corn bread for supper. We both napped through the TV shows we were trying to watch and decided to go to bed and watch a little more TV in bed. Thank you God for being with us and guiding us through our projects today.

0 comments: