Total Pageviews

Weather Where We Live

Blog Archive

Wednesday, October 31, 2018

postheadericon Gay Oct-30-18


Cheri and I both had good a day, much better than yesterday. I had a wall that needed to have some plaster put on as I made a change on where the tile was starting. Finished with the shower incline as I had a few tiles to rearrange and is now ready for grout after it dries, hopefully I can grout Thursday. I got started doing some wall tiling on the walls outside the shower, got another coat of paint on the toilet riser, and worked on putting together a large cabinet that will be going into the bathroom. It was after 6:00 pm when I got home. Cheri went to the church this morning to help pack the rest of the shoe boxes for “Operation Christmas Child”. She also stopped at the fabric shop for some additional material. This afternoon she work on her quit project and got the things she did wrong yesterday straighten out. She had a visit with next door neighbor Jean. We had left over chili for supper and a normal evening of TV. Thank you God for a blessed day.        


Ready for grout

Installing tile

More tile work

0 comments: