Total Pageviews
Weather Where We Live
Links Of Interest
Blog Archive
-
▼
2018
(365)
-
▼
October
(31)
- Gay Oct-30-18
- Gay Oct-29-18
- Gay Oct-28-18
- Gay Oct-27-18
- Gay Oct-26-18
- Gay Oct-25-18
- Gay Oct-24-18
- Gay Oct-23-18
- Gay Oct-22-18
- Gay Oct-21-18
- Gay Oct-20-18
- Gay Oct-19-18
- Gay Oct-18-18
- Gay Oct-17-18
- Gay Oct-16-18
- Gay Oct-15-18
- Gay Oct-14-18
- Gay Oct-13-18
- Gay Oct-12-18
- Gay Oct-11-18
- Gay Oct-10-18
- Gay Oct-9-18
- Gay Oct-8-18
- Gay Oct-7-18
- Gay Oct-6-18
- Gay Oct-5-18
- Gay Oct-4-18
- Gay Oct-3-18
- Gay Oct-2-18
- Gay Oct-1-18
- Gay Sept-30-18
-
▼
October
(31)
Friday, October 26, 2018
Gay Oct-25-18


No bathroom work today. I headed out at 7:45 am to Doug and Judy’s to
help Doug install a floating laminate floor over an existing tile floor. There
is more to do than I thought there was. It is going to be about a four day
project and I have only two days to work on it. It took a while to get started
as all the base board had to come off. Doug hadn’t planned on taking off the
base board but told him that it would look much better afterwards. After we got
some of it done he was happy that we removed the base board. It was around 4:30
pm when we quit for the day. We got the laundry room, pantry, and most of the dinette
area done. A lot of cutting which took much longer. It was near 5:30 pm when I
arrived home. Cheri was busy with laundry, grocery shopping, and fixing a meal
to take over to Pam and Mike’s tomorrow while cleaning and moving into their
new house. After supper we made a trip to Calver’s for a Concrete Mixer as
Cheri had a coupon buy one get one free. They are almost the same as the DQ
Blizzard. On the way back to the house we filled the car with gas. We watched a
little TV before calling it a night. Thank you God for being with us and
helping friends.
![]() |
Flooring work done today. |
Subscribe to:
Post Comments (Atom)
0 comments: