Total Pageviews
Weather Where We Live
Links Of Interest
Blog Archive
-
▼
2018
(365)
-
▼
October
(31)
- Gay Oct-30-18
- Gay Oct-29-18
- Gay Oct-28-18
- Gay Oct-27-18
- Gay Oct-26-18
- Gay Oct-25-18
- Gay Oct-24-18
- Gay Oct-23-18
- Gay Oct-22-18
- Gay Oct-21-18
- Gay Oct-20-18
- Gay Oct-19-18
- Gay Oct-18-18
- Gay Oct-17-18
- Gay Oct-16-18
- Gay Oct-15-18
- Gay Oct-14-18
- Gay Oct-13-18
- Gay Oct-12-18
- Gay Oct-11-18
- Gay Oct-10-18
- Gay Oct-9-18
- Gay Oct-8-18
- Gay Oct-7-18
- Gay Oct-6-18
- Gay Oct-5-18
- Gay Oct-4-18
- Gay Oct-3-18
- Gay Oct-2-18
- Gay Oct-1-18
- Gay Sept-30-18
-
▼
October
(31)
Tuesday, October 9, 2018
Gay Oct-8-18


I was back to work on the
bathroom project at 8:00 am. I worked on wet sanding the plaster and did a
finish coat on a couple of places. Still have some more wet sanding to do and a
little touch up and the plaster will be done. I also mixed the cement and sand
for the shower floor pre slope and got that done. It has to dry for 24 hours
before I can install the shower floor liner. I worked on the vanity and got the
top refasten and the front top ready for tile. I also got the door frame to the
closet cut and ready to install and got the clothes racks installed in the
closet. The last thing I did was make a trip to Lowe’s for some additional
supplies. Cheri went when me to look at a cabinet that she wants to put in the
spare bedroom that will hold all of containers she has. Cheri did make a trip
to the bank and found it was closed, forgot that it was a federal holiday. The
rest of her day was spent in the sewing room. I was done work by 4:30 pm. After
I got done showering Cheri had supper ready for us. The evening was watching TV
and napping for me. Thank you God for helping us through another day.
![]() |