Total Pageviews

Weather Where We Live

Blog Archive

Tuesday, October 9, 2018

postheadericon Gay Oct-8-18


I was back to work on the bathroom project at 8:00 am. I worked on wet sanding the plaster and did a finish coat on a couple of places. Still have some more wet sanding to do and a little touch up and the plaster will be done. I also mixed the cement and sand for the shower floor pre slope and got that done. It has to dry for 24 hours before I can install the shower floor liner. I worked on the vanity and got the top refasten and the front top ready for tile. I also got the door frame to the closet cut and ready to install and got the clothes racks installed in the closet. The last thing I did was make a trip to Lowe’s for some additional supplies. Cheri went when me to look at a cabinet that she wants to put in the spare bedroom that will hold all of containers she has. Cheri did make a trip to the bank and found it was closed, forgot that it was a federal holiday. The rest of her day was spent in the sewing room. I was done work by 4:30 pm. After I got done showering Cheri had supper ready for us. The evening was watching TV and napping for me. Thank you God for helping us through another day.    

Shower floor ready for the cement and sand mix



0 comments: