Total Pageviews
Weather Where We Live
Links Of Interest
Blog Archive
-
▼
2018
(365)
-
▼
October
(31)
- Gay Oct-30-18
- Gay Oct-29-18
- Gay Oct-28-18
- Gay Oct-27-18
- Gay Oct-26-18
- Gay Oct-25-18
- Gay Oct-24-18
- Gay Oct-23-18
- Gay Oct-22-18
- Gay Oct-21-18
- Gay Oct-20-18
- Gay Oct-19-18
- Gay Oct-18-18
- Gay Oct-17-18
- Gay Oct-16-18
- Gay Oct-15-18
- Gay Oct-14-18
- Gay Oct-13-18
- Gay Oct-12-18
- Gay Oct-11-18
- Gay Oct-10-18
- Gay Oct-9-18
- Gay Oct-8-18
- Gay Oct-7-18
- Gay Oct-6-18
- Gay Oct-5-18
- Gay Oct-4-18
- Gay Oct-3-18
- Gay Oct-2-18
- Gay Oct-1-18
- Gay Sept-30-18
-
▼
October
(31)
Wednesday, October 10, 2018
Gay Oct-9-18


I was back to work on the
bathroom project. I finished the wet sanding on the drywall, glad to have that
done but may have to do some touchup work on it. I got the crown molding back
up and the caulking done around it. I finished the closet door frame and the
casing install on the closet side of the opening. I got the casing reinstalled
on the bedroom side of the door into the bathroom and also a piece of the
baseboard reinstalled. I also got the shower liner laid out and splice and is
now ready to be installed. Last I made a trip to Lowe’s for door trim and
baseboard. I am trying to get things set up to have the painters come. It was
near 5:00 pm when I got home. This morning Cheri got her Tuesday house work
done and made a trip to the bank, just as she got home Jean came over for a
visit. She left at noon just as I was coming home for lunch. This afternoon Cheri
worked in her sewing room. The evening was spent watching TV along with popcorn
for me and a cookie for Cheri which I also had one after the popcorn. Thank you
God for a blessed day.
Subscribe to:
Post Comments (Atom)
0 comments: