Total Pageviews

Weather Where We Live

Blog Archive

Thursday, June 13, 2019

postheadericon Gay June-12-19


I left at 8:30 am to head back to work in the Sunday school kitchen. I put another coat of plaster on the wall where I closed up the opening. A couple more coats and that will be ready for paint. The rest of the day was spent installing cabinets, installing the sink in a temporary top of plywood, and hooking up the plumbing. In between all of this I had to make a trip to Lowe’s to get the plumbing materials I needed. It was a long day but things went well. It was after 6:00 pm when I quit for the day. I was waiting for a delivery for the rest of the cabinets which was supposed to be between 2:30 pm and 6:30 pm. Jerry had Bible study this evening so he came to relieve me as we were still waiting at 6:15 pm. Cheri did her Wednesday house work along with a few other things she needed to get done. It was a normal evening of TV, Cheri watching and me napping. We got another ¼ inch of rain. With the rain and hot weather things are starting to green up again. Thank you God for a blessed day.

Installing cabinets



0 comments: