Total Pageviews

Weather Where We Live

Blog Archive

Wednesday, June 5, 2019

postheadericon Gay June-4-19


I am happy to report that I got the bathroom shower project done. It did take a lot longer to finish than I thought it would. I forgot to take a finished picture to post. If I get time I will stop tomorrow for the picture. I checked out the couple with the air conditioner problem. They need to have a new electrical circuit installed from the breaker panel. I gave them a price on how much it would cost and wasn’t happy with the price. My next stop was to repair a toilet which needed a new water control valve. Being that it is a Kohler it cost more for the repair parts. I was able to get them at Lowe’s. It was 4:00 pm before I was done for the day. Cheri was busy with housework and a visit from Jean out next door neighbor. This afternoon she make chicken and dumplings to have for supper. I am always happy when she makes them. We watched a couple more Hallmark movies this evening and are now all caught up on the shows we have recorded. Thank you God for a blessed day.

0 comments: