Total Pageviews

Weather Where We Live

Blog Archive

Friday, August 23, 2013

postheadericon Gay Aug-22-13

Cheri had an early exercise class this morning so I went right to work outside in the shed and got thing moved around so that I can now get the electric hooked up to the shed. When Cheri got home we took down the old kitchen drapes and did some measuring so we could get the materials I need to make the wood valance frame. Cheri had some material left over from making the living room valances and decided to use it to recover the platform rocker we have in the living room. She worked on that while the guys were here to install our new internet service. I told the installers how and where I wanted then the modem but they thought better and did it their way and got themselves into a mess. I was really upset and I did let them know it. It would have been a simple install if they had done it the way I wanted it. They did finally get it up and running. After they left we headed out to get the valance materials and stopped by Mike and Mary’s to drop off a couple of concrete edging pieces I didn’t want. We were telling them that we were headed to Home Depot to for valance materials and Mike said he had something that would work for part of the project so we loaded the materials in and took them home. So that will save us a few dollars. We still went to home depot to get the additional materials we needed. We also stopped by the Sprint store to get our air card disconnected and they told me they couldn’t do it and all I had to do was dial star two on my phone to get it done. So while we were waiting for our pizza at Marco’s I made the call and got that done after ten minutes of them trying to get me to keep the service. We got caught in a rain down pore getting from Marco’s to Home Depot. I don’t know how much we got but I am sure it was around two inches. I still don’t have my rain gauge up. Maybe I am procrastinating because I really want a weather station with all the bells and whistles.     

0 comments: