Total Pageviews

Weather Where We Live

Blog Archive

Friday, August 9, 2013

postheadericon Gay Aug-8-13

It was another busy day in the Sharp’s house. This morning I took apart another cabinet for Cheri to paint. I had a little material left over from making backs for the other three cabinets so I made a back for this one. When Cheri got home from her pool exercise she went right to work painting. In between her painting she put together a new recipe of potatoes, kielbasa, peppers, onions and lot of different spices. She put it all in the crock pot, what a nice aroma we had in the house this afternoon. This afternoon I hung tool bars in the kitchen, moved the refrigerator out and cleaned behind it and put it back in place and leveled it up. My main reason for moving it was to get it leveled up and get the vents cleaned on it. Well I found quite the mess under it. Then I moved on to turning up the temperature on the hot water heater. It is behind a panel in the closet of the master bedroom, first I had to remove a lot of clothes to get to the panel. The next job was putting up the wire mold for the kitchen TV and rearrange things on the desk, trying to hide all the cords. It took Cheri all day painting and didn’t get done until around 3:00 pm. I put the freshly painted cabinet back together and we moved it into the sewing room. Cheri has two more small cabinets to paint. With all these cabinet I still don’t think she is going to have room for everything, don’t know where she put everything in the 5th wheel. Cheri’s supper tasted as good as it smelled all afternoon. We did get a lot done today and Cheri has one more day of painting cabinets and that will be done.       

0 comments: