Total Pageviews

Weather Where We Live

Blog Archive

Friday, June 26, 2015

postheadericon Gay June-25-15

Yesterday the new kitchen cabinet arrived and was waiting for us when we got home from our day of celebrating and shopping. I knew the cabinet had to be assembled. We had ordered a sample door and knew this was the color we wanted but I wanted to get one cabinet to see if it was build to my standards. Well when I opened the package the first thing I checked was the door and drawer front and wasn’t happy with what I was looking as. There were several small imperfections in the door and the drawer front had less black markings on it. I was tired and didn’t want to deal with it until today. Needless to say I didn’t sleep well and was worrying about what I was going to do. So this morning we took another look at it and decided it wasn’t an imperfection but was character. So while Cheri was doing her house work I started putting the cabinet together. It took most of the day as I had to get things set up for the assembly and the directions were very bad. I had to watch some videos on line and they were some different then what I had. By 1:30 pm it was all together and looks fine and I really like the construction as it is all plywood except for the door and drawer front. So after all was said and done we are very happy with it and will be ordering the rest of the cabinets when we get enough money in our construction budget. This afternoon we met Mike and Pam at Home Depot to go and see Ron and Sandy, wanted to see how Ron was coming long with the new knee. He was in good spirits and was feeling better than he did at this point with his first knee replacement. After a nice visit Mike, Pam, Cheri, and I went to Wesley Chapel to have dinner at Grillsmith one of my favorite places to eat. So it turned out to be a good day after all.     

0 comments: