Total Pageviews
Weather Where We Live
Links Of Interest
Blog Archive
-
▼
2019
(361)
-
▼
August
(31)
- Gay Aug-30-19
- Gay Aug-29-19
- Gay Aug-28-19
- Gay Aug-27-19
- Gay Aug-26-19
- Gay Aug-25-19
- Gay Aug-24-19
- Gay Aug-23-19
- Gay Aug-22-19
- Gay Aug-21-19
- Gay Aug-20-19
- Gay Aug-19-19
- Gay Aug-18-19
- Gay Aug-17-19
- Gay Aug-16-19
- Gay Aug-15-19
- Gay Aug-14-19
- Gay Aug-13-19
- Gay Aug-12-19
- Gay Aug-11-19
- Gay Aug-10-19
- Gay Aug-9-19
- Gay Aug-8-19
- Gay Aug-7-19
- Gay Aug-6-19
- Gay Aug-5-19
- Gay Aug-4-19
- Gay Aug-3-19
- Gay Aug-2-19
- Gay Aug-1-19
- Gay July-31-19
-
▼
August
(31)
Tuesday, August 13, 2019
Gay Aug-12-19


Just another work day
which starts at 6:00 am with coffee and breakfast. The first thing I did this
morning was to return the jack I had rented for the beam support repair. Then a
quick stop at Menard’s for an additional electrical outlet I needed to finish the
electrical in the new wall. The rest of the day was spent on the stairway wall
has I had to remove the step that is before the door that goes upstairs and
rework it for the reinstall. At one time it was an open stairway without the
door. Whoever did the install didn’t do it right and now I am having a time
correcting it. I had to build out the wall to make room for the electrical
switches and so the wall would be the same on both sides of existing door.
Cheri put on another coat of paint on the kitchen ceiling so all the ceiling
are now painted. Cheri also followed behind me cleaning up the mess I made
which is a big job as I am pretty messy. I quit at 4:30 pm and Cheri still had
some clean up to do and I headed for the shower. Nikki didn’t get home until
after 6:00 pm. Cheri and Nikki fixed us pulled pork sandwiched for supper. It
was a short evening of TV as we were all tired from the day’s work. Thank you
God for a blessed day.
Subscribe to:
Post Comments (Atom)
0 comments: