Total Pageviews

Weather Where We Live

Blog Archive

Thursday, August 29, 2019

postheadericon Gay Aug-28-19


I started at 7:00 am this morning getting saw out and setup to do the window trim and the rest of the base board in the living room. Peter would be here around 8:30 am and want to have thing ready. I got the base board for the living room out so Cheri could get it painted before putting down as trying to paint it on the carpeting wouldn’t work very well. With peter’s help we got all the windows and door trimmed done except one door and parts of two windows  as we ran out of trim and was also short three feet of base board. We also got all the crown molding back up and looks nice with the corner decorations. I think it was around 4:30 pm when Peter left. I have a lot of caulking to do and was going to do it this evening but by 6:00 pm I was too tired to continue. Nikki had a mission trip meeting this evening so after Cheri and I showered we went to Calver’s for supper and then to Menard’s to pick up the base board and window trim we need. It was 8:30 pm when we got home. It was a long day but got a lot done. Thank you God for helping us through the day.



The window moldings are done, still needs to be painted

If you look close you can see the crown molding.


0 comments: