Total Pageviews
Weather Where We Live
Links Of Interest
Blog Archive
-
▼
2019
(361)
-
▼
August
(31)
- Gay Aug-30-19
- Gay Aug-29-19
- Gay Aug-28-19
- Gay Aug-27-19
- Gay Aug-26-19
- Gay Aug-25-19
- Gay Aug-24-19
- Gay Aug-23-19
- Gay Aug-22-19
- Gay Aug-21-19
- Gay Aug-20-19
- Gay Aug-19-19
- Gay Aug-18-19
- Gay Aug-17-19
- Gay Aug-16-19
- Gay Aug-15-19
- Gay Aug-14-19
- Gay Aug-13-19
- Gay Aug-12-19
- Gay Aug-11-19
- Gay Aug-10-19
- Gay Aug-9-19
- Gay Aug-8-19
- Gay Aug-7-19
- Gay Aug-6-19
- Gay Aug-5-19
- Gay Aug-4-19
- Gay Aug-3-19
- Gay Aug-2-19
- Gay Aug-1-19
- Gay July-31-19
-
▼
August
(31)
Saturday, August 24, 2019
Gay Aug-23-19


It was 57 degrees here
this morning, nice working in the house with the windows open. Before Nikki went
to work she made a trip to Menards to get another gallon of paint. Cheri got
the second finish coat of paint done in the dining room along with finishing
the trim paint. Now it is ready for me to install the wainscoting which I hope
to start on tomorrow. Cheri also got the first finish coat of paint on in the
living room. I got the grout done on the kitchen back splash this morning. This
afternoon I worked on the bathroom drain as it was draining very slowly. I took
the drain apart but didn’t find that much hair and was more buildup of soap
scum. So I made a trip to Menards to get some drain cleaner. I got some extra strength
that is a gel and you pour it in and let it sit for 10 minutes and then pour
boiling hot water down the drain. I did this twice and it is now draining well.
I went to reinstall the kitchen outlets and because of the tile the mounting
screws were too short. So after I showered I made another trip to Menards for
screws. When I got home Cheri had her shower done and Nikki was fixing pulled
pork sandwiches for supper. We watched a couple of shows and called it a night.
Thank you God for a bless day.
![]() |
the tile is grouted and ready to have the outlets installed |
Subscribe to:
Post Comments (Atom)
0 comments: