Total Pageviews
Weather Where We Live
Links Of Interest
Blog Archive
-
▼
2020
(360)
-
▼
September
(30)
- Gay Sept-29-20
- Gay Sept-28-20
- Gay Sept-27-20
- Gay Sept-26-20
- Gay Sept-25-20
- Gay Sept-24-20
- Gay Sept-23-20
- Gay Sept-22-20
- Gay Sept-21-20
- Gay Sept-20-20
- Gay Sept-19-20
- Gay Sept-18-20
- Gay Sept-17-20
- Gay Sept-16-20
- Gay Sept-15-20
- Gay Sept-14-20
- Gay Sept-13-20
- Gay Sept-12-20
- Gay Sept-11-20
- Gay Sept-10-20
- Gay Sept-9-20
- Gay Sept-8-20
- Gay Sept-7-20
- Gay Sept-6-20
- Gay Sept-5-20
- Gay Sept-4-20
- Gay Sept-3-20
- Gay Sept-2-20
- Gay Sept-1-20
- Gay Aug-31-20
-
▼
September
(30)
Gay Sept-25-20


Well no one showed up to
work on the carport again today and no phone call. I finished my work over at
Donna’s on the inside of her house except for doing some cleaning where I did
my work. I still have some work on the roof of her carport and clean the rain
gutters. It took me until noon to get all of my tools home. I unloaded some of
stuff I didn’t need for this afternoon. I went over to Ron and Sandy’s to build
and install a counter top extension. Then I installed lift cylinders to two
overhead cabinet doors. Sandy wasn’t able to hold the door open and get out the
things she wanted. It was 6:00 pm when I got home as it took me longer than I
thought it would. I had to do some modifications on the cabinets in order to
install the cylinders. After I got cleaned up Cheri had supper ready for us
(ribeye steak and baked potato). It was after 7:00 pm before we were ready for
the recliners. We got a call from Larry and Denise at 8:00 pm. It was good to
get caught up on what they have been doing. As of right now they may be able to
come down after the first of next year. We watched an episode of Date Line and
called it a night. Thank you God for a blessed day. Once again I forgot to take
pictures of the counter top extension and the cabinet door lifts.
0 comments: