Total Pageviews
Weather Where We Live
Links Of Interest
Blog Archive
-
▼
2020
(360)
-
▼
September
(30)
- Gay Sept-29-20
- Gay Sept-28-20
- Gay Sept-27-20
- Gay Sept-26-20
- Gay Sept-25-20
- Gay Sept-24-20
- Gay Sept-23-20
- Gay Sept-22-20
- Gay Sept-21-20
- Gay Sept-20-20
- Gay Sept-19-20
- Gay Sept-18-20
- Gay Sept-17-20
- Gay Sept-16-20
- Gay Sept-15-20
- Gay Sept-14-20
- Gay Sept-13-20
- Gay Sept-12-20
- Gay Sept-11-20
- Gay Sept-10-20
- Gay Sept-9-20
- Gay Sept-8-20
- Gay Sept-7-20
- Gay Sept-6-20
- Gay Sept-5-20
- Gay Sept-4-20
- Gay Sept-3-20
- Gay Sept-2-20
- Gay Sept-1-20
- Gay Aug-31-20
-
▼
September
(30)
Saturday, September 5, 2020
Gay Sept-4-20


Just a normal morning with
two plus mile walk, writing the blog, quiet time with God, coffee, and
breakfast with Cheri. She already had the Friday laundry going. The cabinets I
ordered for Donna Perkins came yesterday so today I put them together. I did it
in the sun room as it was too hot outside to do it. It took all day to get the
job done as one of the cabinets had to be cut down to a 12 inch cabinet because
I have a space of 60 inches to put them in. As soon as I got them together I
quit for the day so tomorrow I have a sun room to clean up. For supper I made a
trip to Culver’s to get a fish dinner which Cheri and I split and still had all
we wanted. We really like their fish. You wouldn’t think you could get good
fish at a fast food place. While I was in the drive through lane it started to
rain really hard and felt sorry for the young man that brought our fish out to
our car. I checked the gauge and received another inch. This evening we watch
another episode of Without a Trace, home improvement shows, and a movie before
calling it a night. I managed to get through the day without doing anything
stupid. I manage to get the bag on the left leg for my shower which was the
right one and not the right leg. I will stop now as I am getting confused. Thank
you God for helping us through this day.
![]() |
Supposed to be cabinets in the boxes |
![]() |
Cabinet number one. |
![]() |
work in progress |
![]() |
Number one done. |
![]() |
I know this is cabinet number three because it is now only a 12 inch cabinet. |
![]() |
Done and ready for install. |
Subscribe to:
Post Comments (Atom)
0 comments: